Work has progressed - the boiler is now complete. The assembly sequence I used was as described in Alex Farmers book on boiler making - and, as it happens, his was also a GWR boiler, although bigger. As the assembly gets bigger, it always surprises me just how much heat it needs. I work outside, so can only work on wind-free ( and preferably dry) days. Also, I find it essential to use refractory bricks- without them, I'd never get up to temperature. Even so, it needed two good sized gas torches, and occasional oxy-propane, to complete the assembly. I couldn't do this alone, and gratefully thank George and Russell for their help. Where ever possible (and that's most of the time), we worked with pre-placed solder - its much easier than applying a stick, as it tends to melt - or at least sag - if you're not quick. We put rings of silver solder under the heads of all the rivet - stays in the firebox. As the solder flowed, each was grasped on the outside with pliers, rotated